PARS Terminal Reorientation, Latvia

PARS Terminal is located in Riga, Latvia. Terminal currently provides transfer of light oil products. Total capacity of shoretank park is 90'000 m3.

The Terminal has chosen to change direction of its operations and to turn to green petroleum logistic hub. Therefore, Meta Engineering AG participates in the PARS Terminal reorientation project to environmentally friendly fuel - Hydrotreated Vegetable Oil (HVO), for storage and transshipment of biofuels.

Strategically situated near key transportation hubs, the terminal ensures efficient access to both raw materials and distribution networks. This strategic positioning facilitates the transportation of HVO to end-users, including fuel stations, industrial facilities, and commercial fleets.

The decision of the PARS terminal to produce HVO in Latvia signifies a substantial investment in renewable energy infrastructure. This move aligns with global efforts to combat climate change by reducing greenhouse gas emissions and decreasing dependence on fossil fuels.

Our Projects
Wind Power Plant in Marijampole, Lithuania
Wind Power Plant in Marijampole, Lithuania

Harnessing Lithuania's wind resources to generate sustainable energy, with an annual capacity of 27,000 MWh.

Saka Wind Power Plant, Latvia
Saka Wind Power Plant, Latvia

A pioneering 385 MW wind power project contributing over 1,310,000 MWh annually, fostering regional development and clean energy production.

PARS Terminal Reorientation, Latvia
PARS Terminal Reorientation, Latvia

Transitioning to a green petroleum logistics hub in Riga, Latvia, focusing on the sustainable storage and transshipment of biofuels.

Let's Get in Touch
Contact info

Address:
Chamerstrasse 85, 6300 Zug, Switzerland

Email:
[email protected]